The Markbygden Phase II Wind Farm (Sweden)
It forms part of the larger Markbygden 1101 wind project that comprises a series of interconnected wind farms in the Markbygden area to annually generate up to 12TWh of electricity from wind power.
The Markbygden Phase II Wind Farm (Sweden)
It forms part of the larger Markbygden 1101 wind project that comprises a series of interconnected wind farms in the Markbygden area to annually generate up to 12TWh of electricity from wind power.
It forms part of the larger Markbygden 1101 wind project that comprises a series of interconnected wind farms in the Markbygden area to annually generate up to 12TWh of electricity from wind power.
Enercon, a wind turbine manufacturer based in Germany, acquired the Markbygden phase II project from Svevind in 2016 and reached a final investment decision (FID) on the same in November 2018.
The Markbygden phase two onshore wind farm will be installed with a total of 201 E-138 EP3 wind turbines from Enercon.
With 138.25m- diametre rotor and up to 180m hub height, each gearless, variable speed wind turbine will have a rated power of 4.2MW.
The project also involves the construction of approximately 150km access road and a substation at Trolltjam, Götaland County.